Coal chemical industry needs priority production of energy products

Coal chemical industry needs priority production of energy products

During the "Thirteenth Five-Year Plan" period, China's coal chemical industry must put energy products in the first place and chemicals in the second place. Under this premise, the implementation of total coal consumption control, and through the cutoff of the feasibility study report to compile the interest chain, the management department issued a deadline to give assessment opinions, and promote the international development of technology, etc., to achieve the "13th Five-Year" period of coal chemical industry Better development.

Energy First Chemicals Second

Coal chemical industry cannot develop excessively. This has become a consensus. What is the focus of the development of coal chemical industry? This must be clear during the "13th Five-Year Plan" period. The products of coal chemical industry are mainly in the fields of energy and chemicals. Energy products are the issue of people's livelihood. Chemicals are the problem of profits. To clarify this issue, we must make it clear whether people's livelihood is prioritized or profits are prioritized.

China is a big country with a population of nearly 1.4 billion. Energy demand ranks first among all material needs. Therefore, coal chemical industry should put energy demand first, regardless of the international crude oil prices down to a certain amount of oil and gas production. But this does not mean not to use chemicals, but to put chemicals in the second place.

The main raw material of coal chemical industry is coal, coal chemical plant converts about 30% of the carbon in coal into products, and about 70% of the other carbon is converted into CO2 and discharged into the atmosphere. Therefore, the key to controlling CO2 emissions is to reduce coal consumption. At present, China's coal consumption has reached the cap value. The author believes that under the circumstance that the coal consumption in the country has reached saturation, the principle of “total control, reduction of east growth and west growth” must be implemented during the “Thirteenth Five-Year Plan” period, that is, to reduce the amount of coal used in the eastern region and in the western region. Increase the amount of coal used to achieve a constant total amount of coal in the country.

Cut off the feasibility of compiling the benefit chain

The project feasibility study report must be provided for all projects in China. There is a great deal of arbitrariness in such feasibility studies. Some reports were completely subject to subjective intentions, which caused the project to discover a series of problems such as insufficient resources, unsatisfactory design values ​​for the technology, unsatisfactory treatment of “three wastes”, etc. after the start of the project, which was far from the original “feasibility”. .

The feasibility report is not feasible because it is generally caused by the following aspects. For example, the preparation party is the future interest party. To obtain the project, the preparation unit will do everything possible to find a reason to prove that the project is feasible; the project is the leader of the board, as long as the leadership determines that the project is feasible. The following people followed the evidence to prove that it was feasible; the owners were eager to win and the construction of the demonstration plant was rashly carried out with untested technologies; the experts were not professional and independent, and in some projects, the experts invited the owners to join in. The specific technology of the project is not professional and lacks judgment.

In order to change this situation, it is proposed to make the following major improvements in the preparation and review of the feasibility study: First, the compiling party cannot participate in the future design, manufacture, supervision, contracting and other fee-based businesses of the project, and equipment manufacturers and technologies related to the project. The provider should not serve as a member of the expert group and cut off the party's interest chain. Second, the preparation of the feasibility report should be led by government agencies at the national level. In particular, after successful major process technologies, a national macro development feasibility study report should be prepared. At the same time, it is necessary to set up a project investigation system. Once there is a problem of “not feasible”, the responsibility of the person in charge should be investigated. Thirdly, major projects should also be analyzed for infeasibility. At the same time, the feasibility study report should be used as the basis for examination and approval by relevant state departments.

Management review should set time limits

During the "12th Five-Year Plan" period, a very peculiar phenomenon appeared in the development of coal chemical industry, which was "Management of lazy government." In many places where the enthusiasm for the development of coal chemical industry is high, the feasibility study report submitted to the competent authority has not been reported for several years. It is neither certain nor denial. The reporters have no choice but to brag their heads for design, ordering and construction. When it was approved, it was basically completed. If you deny the project again at this time, who will bear the consequences and how should you bear it?

Therefore, it is necessary to manage and control the management department and implement the principle of “period review”. That is, after the feasibility study report is submitted, the reply will be given within a certain period (eg 3 months). If the non-response is expired, it will be approved automatically.

Pushing technology out of the country

The development of modern coal chemical industry in China has gone through the stages of purchasing foreign patented technologies and independently developing process technologies, forming FT synthesis, MTO, pressure swing adsorption, low-temperature methanol washing, multi-nozzle coal gasification, aerospace furnaces, and Tsinghua. Furnace, syngas, ethylene glycol and many other independent technologies, many technologies have been used extensively in the coal chemical industry, and gradually mature, reaching or exceeding the world's advanced level.

Therefore, the development of coal chemical industry in China should enter the new stage of process technology to the world. Specifically, it is to sell these unit technologies to countries in need in the world. It is recommended that the state authorizes China National Petroleum Corporation and the Federation of Chemical Industry to start this work.

Pole Anchor/ground spike /Earth Spike 
Material: Steel
Diameter: 51X51MM--101X101MM
Length: 150MM--900MM
Capacity: 2 ton
Color: silver ,red,or other colors
Treatment: hot dip galvanized,pvc coated,powder coated or others
Product Type: Post anchor
packing : pellet, wooden case or customed
delivery time : 25days after received deposit
Widely used in construction to fasten and install the fence post, shaky board room, metal wire mesh,  Flag poles, Traffic signs ,Bill board,sheds,tent and so on.
surface :Hot dip galvanized,Powder coated.Electrical galvanized 
Our Superiority :

Ground Spike / Pole Anchor

Galvanized Steel Fence Pole Anchor, Steel Ground Spike ,Earth Spike ,Earth Anchor

BAODING JIMAOTONG IMPORT AND EXPORT CO., LTD , https://www.chinagroundscrew.com