Principle of seal production

At present, most of the sealing materials used at home and abroad are high-molecular elastomers, and some special conditions also use plastics and various metals. However, regardless of the type of material, it should have the following properties:


1, has a certain mechanical physical properties: such as tensile strength, tensile strength, elongation


2, have a certain degree of elasticity, hardness, and compression of permanent deformation;


3, adapt to the working medium, not easy to produce swelling, decomposition, hardening


4, wear, have a certain tear resistance


5, with high temperature, low temperature aging properties.


However, without any sealing material including all of the above properties, it is necessary to select a suitable sealing material according to the working environment, such as temperature, pressure, media, and movement, and to meet certain requirements by formulating a matching formulation of the material. Or use two or more kinds of materials in the form of compound or combined structure to exert their respective specialties and achieve more comprehensive results.


The formation of sealing effect: dynamic sealing is divided into non-contact seal and contact seal. Non-contact seal is mainly a variety of mechanical seals, such as: graphite packing rings, floating ring seals, etc.; rubber composite seals and rubber and plastic composite seals are contact seals, relying on the preloading force loaded in the sealed cavity, Block the leaky channel and obtain a sealing effect. Seals used in hydraulic systems are mostly static seals (face seals), reciprocating seals (pistons, piston rod seals), and rotary seals.


Factors influencing the sealing effect: the choice of sealing structure and the formation of oil film, pressure, temperature, compatibility of materials, the material, hardness, geometry, surface finish, etc. of the working surface contacted by the dynamic seal, so that the seals and photovoltaic devices are such Product play.


First, the seal material and the hydraulic oil (liquid) compatibility: One of the sources of hydraulic oil particle contamination is the seal material and hydraulic oil is not adapted to produce "debris" or "wear debris." The "chips" of the seal that have been damaged due to "swelling" or the unbound inorganic and filler reinforcing materials that have been "strigged out" cause the seals to be damaged and fail, and at the same time cause hydraulic pollution to the formation of oil. Oil deteriorated and failed.




O-ring ( )


Corporate contact information is as follows:

Company Name: Shanghai Luo Geng Electromechanical Technology Co., Ltd.

Address: Room 1810, Block C, 547 Tianmu West Road, Shanghai

Contact: Manager Chen

Cell phone

phone

fax

Qq number

mailbox:


Three-dimensional earthwork mat is a kind of three-dimensional mesh fabric made of polymer composites. The texture of the earthwork mat is loose and pliable, with 90% of the space to fill the soil and sand, and the root system of the plant can grow through the mat. The grass skin that grows hind makes net cushion, grass skin, soil surface firm together. The root system of plants can be reached under the surface of 30-50cm, thus forming a solid green composite protective layer.

Earthwork mat is a new type of earthwork synthetic material which is suitable for soil and water conservation. It can effectively prevent soil erosion and increase the green area and improve the ecological environment.

Function:


1.Alternative concrete, asphalt, slab stone and other slope protection materials, mainly used for highway, railway, river, embankment, slope and other slope protection.

2.The soil can be protected from wind and rain before it grows up

3.The compound protection layer formed after the plant grows can withstand high water level, and hurried water flow.

4.The cost of the project can be greatly reduced, and the cost is only 1/7 of the concrete protection slope and the slope of dry masonry, and 1/8 of the slurry masonry stone.

5.Due to high polymer materials and UV anti-stabilizer, it has high chemical stability and no pollution to the environment.

6.The construction is simple, after the surface level is flat, can be constructed.

Application

When construction can use small bamboo pole or small stick to wear in the whole coil net cushion, spread out to pull out stick, surround with bamboo nail, wooden nail or plastic nail, the nail distance is 30cm, each square meter 10 nails.

The length of nails is generally 15cm (from the ground), and the loose surface should lengthen the length of nails. When laying in the high slope, the length of the nails used should be longer than the length of the nail in the lower slope.

The topographic mutation or the terrain is more complicated, should be careful to keep the net pad level, and to increase the nail density.

Attention lap. The lap length is 2cm, the connecting pin should be nailed in, the density of the nail should double, and the upper layer of the lap joint should be close, without leaving the gap.

In the shape of the nail, the upper end of the nail should be greater than 2 times the diameter of the mesh, so that it can also have a vertical suppression effect.

Seed sowing depth should be according to the soil information, adjust measures to local conditions, grass should choose to suit the local climate conditions, root length, and rich grass seed, have long roots of perennial small shrubs in between is better.

Grass seed seeding depth should be in the mat, so as to enhance the effectiveness of the compound protection layer.

After seeding, the topsoil cover should be covered by covering the net. Don't expose the mat to the sun. However, it is important to take care of the seed germination and growth.

After seeding, the water content of the upper layer should be 40 to 50%.It is pressurized on top surface to help seed germination.

10.When the net mat is laid at the top of the slope, the vertical joint of the net cushion should be 60 degrees and buried 30cm in the soil. Bottom should be over 50 cm level, because of the side slope engineering of the water content was much lower than the lower layer, is not conducive to seed germination, gauze pad should be in the 20 cm suitable holding open a ditch, top place for irrigation.

11.The timing is the key to the whole project (when used on the slope), usually in the first three to four months before the rainy season. Let the turf have some time.

Notes:

1.Cannot be used as the surface protection material.

2.Only the surface planting grass slope, cannot use as deep reinforcement material.

3.When used for river slope protection, the construction should be completed in the first three months of the rainy season. In order to ensure the high water level above the grassy slope is firmly formed.


3D Geomat

3D Waterstop Control,Erosion Control Mat,Geomat For Slope Protection,Earthwork Support Geomat

ZHEJIANG BOYA COMTECH CO.,LTD , https://www.zjbytx.com